Stamp obligation land tax: claiming a number of dwellings reduction earlier than bodily works start

A tribunal case determination launched in July 2021 held that a number of dwellings reduction was not out there in two lead appeals the place builders had purchased websites for brand new properties.

The First-Tier Tribunal Tax Chamber launched a call on 7 July 2021 within the mixed appeals of Ladson Preston Ltd and AKA Developments Greenview Ltd v HMRC regarding a number of dwellings reduction (“MDR”). MDR is a priceless reduction from stamp obligation land tax (“SDLT”) the place a number of “dwellings” are acquired. The impact of the reduction is to cut back the SDLT by giving a number of use of the decrease tiers of the charges of SDLT.

The choice centred on the prolonged definition of “dwelling” for MDR functions which features a constructing “within the strategy of being constructed” on the efficient date of the transaction (“EDT”).

The circumstances have been lead appeals for 2 teams of circumstances:

  • For the primary group bodily works had not begun.  The taxpayer argued that “within the strategy of being constructed” has a large which means in order to present impact to an intention of the laws to encourage the development of latest properties.  They argued that even early steps, comparable to acquiring planning consent or getting ready architects plans earlier than the completion of a purchase order, meant that the property counted as a variety of dwellings.
  • For the second group, some bodily works had been carried out earlier than the completion of the acquisition.  The taxpayer argued that this strengthened the place.

The Tribunal held that planning permission is just not a part of the property being acquired and so wouldn’t make the property rely as “dwellings”.  They thought-about the definition of the “material of the transaction” and determined that:

“A purchaser’s personal plans and preparations made earlier than the EDT for establishing dwellings on a property (comparable to acquiring architect’s plans, or concluding contracts with suppliers or sub-contractors for the development mission, or securing finance for the mission) equally are usually not one thing that’s acquired from the vendor by the purchaser as a part of the subject material of the transaction that’s topic to SDLT.”  The Ladson Preston attraction failed on that floor.

The Tribunal determined that the declare for MDR additionally failed within the AKA case, the place some works had been carried out by the customer earlier than the EDT; that they had made some boreholes on the property.

The Tribunal didn’t in its determination consult with HMRC steering at SDLTM00400 the place HMRC say “Related properties which might be within the strategy of being constructed shall be handled as dwellings on the level the place constructing works on prime of the foundations have begun.”

The Tribunal did refer within the determination to the “golden brick” ideas for VAT the place an HMRC Guide says “It’s accepted {that a} constructing is being constructed when work has progressed above basis degree. That is normally when partitions start to be constructed upon the foundations.”  Nevertheless, the Tribunal stated it didn’t want to contemplate this additional, because it was in a position to resolve the matter on one other floor.

The reasoning for this different floor is sudden although!  The Tribunal stated the works carried out by the customer (making the boreholes) have been “not one thing title to which the vendor transferred“.  That is stunning because the works affected the bodily nature of the land on the EDT.  The same old precept is that one seems to be on the nature of the property as it’s on the EDT.  The reasoning of the Tribunal would trigger considerations in a case the place a purchaser has taken management of a part of a website and acquired constructing work past the inspiration stage earlier than the EDT.  On ordinary ideas and in accordance with the HMRC steering, one would anticipate this to rely as buildings within the strategy of building and so qualify for MDR.

The Tribunal additionally talked about a degree I’ve written about earlier than on whether or not the three% surcharge applies to the factor of the worth paid for “dwellings” in a blended use transaction, the place a number of dwellings reduction is claimed.  The Tribunal stated they didn’t must resolve the difficulty, as soon as it was established that a number of dwellings reduction was not out there.  I’m instructed that the representatives for HMRC didn’t within the listening to search to resile from the steering on this level within the HMRC handbook at SDLTM09740.

I’m instructed that go away to attraction the choice is being sought as HMRC have recognized a variety of circumstances the place MDR has been searched for properties the place bodily works had not began on the time of the acquisition, or the place works had not acquired above basis degree.  Within the meantime builders shopping for websites with planning permission would do effectively to funds for SDLT with out the reduction and deal with with warning assured claims that the reduction is out there.  Explicit care ought to be taken with any suggestion that the customer do some work to the property earlier than completion in order to safe the reduction.


John Shallcross

John Shallcross is an Affiliate in Blake Morgan’s Property Service workforce, specialising in stamp obligation land tax. John’s background as a property lawyer provides him an perception into transactions to which advanced SDLT guidelines are utilized. He takes a specific curiosity in SDLT on residential property transactions, particularly points with the three% surcharge and a number of dwellings reduction.